Annexure 8 — CONSULT_MANUAL
Original Rule Text
Note: If the answer is yes, in all the cases, the consultancy firm is considered technically qualified for the assignment.
Sr. No. Item Required response 1 Does the consultancy firm have the required experience? Yes 2 Does the proposed methodology of work fulfil the objectives of the assignment/ job till the last detail of the ToR? Yes 3 Do the methodology, work plan and staffing schedule provide coverage of the entire scope of work as described in ToR? Yes 4 Does the team leader fulfil the minimum educational qualification and experience criteria? Yes 5 Has the consultant provided for all the professionals for requisite expertise? Yes 6 Does the key professional (indicate the position) fulfil the minimum educational qualification and experience criteria? [Evaluate for all the proposed key personnel] Yes 7 Does the staffing schedule including the key professionals proposed, the responsibility assigned to them and the support staff together is adequate for performing the entire scope of work indicated in the ToR? Yes
Annexure 8: Format for Simplified Evaluation of Quality (LCS/ EoI) (Refer to Annexure 6) (If so, specified in Bid Documents)