8.4.7 Technical Evaluation Report At the end of the technical evaluation process, the CEC shall prepare a technical evaluation report of the "quality" of the proposals recording the scores given to each criterion and subcriterion, as well as explain the decisions and take the competent authority's (CA) approval. For each proposal, the report also should substantiate the results of the evaluation and indicate technical weaknesses or deviations from the terms set out in the RfP and comment on their acceptability. This committee shall record in detail the reasons for acceptance or rejection of the bids analysed and evaluated by it. The CA may ask the CEC to explain the report but should not request that scores be changed. It should review the CEC’s evaluation of each proposal (on technical, contractual, and other aspects). The CA should decide how any acceptable deviation in each proposal should be handled during negotiations, in case that proposal is ranked first. The technical evaluation report is a confidential document, and its contents shall not be disclosed. All records relating to the evaluation, such as individual mark sheets, shall be retained until completion of the project and its audit. A sample format for preparation of technical evaluation report and financial evaluation report including award recommendation to the competent authority is given at Annexure 6.
8.4.8 Declaration of Results After evaluation of quality has been completed, the Procuring Entity shall notify those consultants whose proposals did not meet the minimum qualifying standard or were
8.4.6 Evaluation of Conformity to Commercial and Other Clauses: Bidder must comply with all the Commercial and other clauses of the RfP Document. The Procuring Entity shall also evaluate the commercial conditions quoted by Bidder to confirm that all terms and conditions stipulated in the RfP Document have been accepted without substantive omissions/ reservations/ exception/ deviation by the Bidder. Deviations from or objections or reservations to critical provisions identified in the Tender Documents will be deemed to be a material deviation. If critical provisions are not explicitly stated in the Tender document, then these shall be taken to be Governing laws and Jurisdiction, Contractor’s Obligations and Restrictions of its Rights, Performance Bond/ Security, Force Majeure, Taxes & Duties, and Code of Integrity). Only minor deviations may be accepted/allowed, provided these do not constitute substantive deviations as per para 8.3.4 above.
Manual for Procurement of Consultancy Services, Second Edition, 2025 considered non-responsive to the RfP and/or ToR, indicating that their financial proposals will be returned unopened after completing the selection process. The Procuring Entity shall simultaneously notify the consultants that have successfully satisfied the qualifying standard or where marks have been awarded, the minimum qualifying marks. The date/ time and place (or on the portal in case of e-procurement) are announced for the opening of Financial Bids in the presence of technically suitable bidders who are willing to attend the bid opening. Such a date should be two to five (5) days after the announcement.