Para 2.16.23 — CAM
CAM
Original Rule Text
2.16.23 Execution of major/minor/repair/original works through Letter of Authorisation/GeM/Tender etc. The following points should be kept in mind:
2.16.23 Execution of major/minor/repair/original works through Letter of Authorisation/GeM/Tender etc. The following points should be kept in mind: